In December 2024, live testing was performed on the 35 kV cables of the Transmission Operation and Inspection Team of the Etuoke Power Supply Company of Inner Mongolia State Grid Power Group, and an inspection report was provided.
In December 2024, live testing was performed on the 35 kV cables of the Transmission Operation and Inspection Team of the Etuoke Power Supply Company of Inner Mongolia State Grid Power Group, and an inspection report was provided.